Modular Camp Solutions

A worksite camp is a small settlement with its own daily routine. People return from shifts, meals are served, laundry runs and supplies arrive while part of the workforce is asleep. The buildings have to work together through all of it.

Karmod supplies modular buildings for accommodation, catering, sanitation and administration. The projects below include worker housing in Turkey and an oil company camp in Libya, each bringing several of these functions into one development.

With 40 years of experience, Karmod is a global brand delivering modular buildings for major projects across 134 countries on seven continents. From worker accommodation in Turkey to oil industry camps in Libya, we bring living quarters, dining halls, sanitary facilities and offices together to support daily life on site. Each camp draws on the experience we have gained serving workforces in different climates, industries and locations around the world.

Prefab Buildings are manufactured off site and assembled at the destination. This separates building production from much of the work on the camp site, allowing the two activities to overlap when the programme permits.

Container units provide another way to arrange bedrooms and service spaces. Larger shared rooms, such as dining halls, have different spatial requirements from individual accommodation units.

The range also includes Modular Military Structures for accommodation and support facilities.

Modular Work Camps

Karmod Ufuk Boru Worksite Buildings

Ufuk Boru Worksite Buildings

A worksite complex in Osmaniye combining worker accommodation, a dining hall and administrative facilities.

Karmod Prefabricated Worker Housing

Prefabricated Worker Housing

Workers’ camp buildings in Turkey with dormitories, a kitchen, dining space and sanitary facilities.

Karmod Oil Company Camp in Libya

Oil Company Camp in Libya

A four-building complex with offices, accommodation, a dining hall and sanitary facilities for an oil extraction site.

For residential developments intended for longer-term occupation, see our mass affordable housing range.

Labor Camp

Demand in a labour accommodation camp peaks around the end of a shift. Showers fill, work clothes go to the laundry and the dining hall receives a large group within a short period. The number of beds tells only part of the story.

Shared bedrooms and rooms with private bathrooms produce quite different accommodation blocks. Storage for personal belongings, space beside beds and access for cleaning all take up floor area.

Labor Camp Design

The labour camp layout plan connects these spaces. Keeping sleeping blocks away from kitchen deliveries and busy communal areas helps separate rest from daytime activity.

  • Sleeping areas: Room occupancy, beds, storage and circulation space should be established together.
  • Staff accommodation: Supervisory and administrative personnel may need a different room arrangement within the same camp.
  • Shared facilities: Laundry, recreation rooms and sanitary units need a defined place in the layout.

modular man camp buildings

Buying a Labour Camp

A new camp can be developed for a single contract or retained for subsequent projects. For buyers considering a labour camp for sale, the intended ownership period is relevant to maintenance, replacement equipment and eventual relocation.

Mining Camp Buildings

At a remote mine, a routine repair can involve a long journey for parts or outside assistance. Maintenance stores, water storage and access for supply vehicles are therefore part of the camp itself, rather than services readily available nearby.

Dust carried in on clothing and footwear adds to the cleaning load. Entrances and changing areas give workers somewhere to leave work gear before entering bedrooms and shared indoor spaces.

Karmod modular camp buildings

Discuss Your Camp Project

Send Karmod the site location, workforce size and intended opening date to discuss a camp proposal. Accommodation, catering and an office complex in modular buildings can be considered within the same brief.

Request a Quote →

Mining Camp Design

The construction workforce at a mine is not necessarily the same size as the team operating it later. An early camp can grow during construction and then serve a smaller permanent workforce. Phasing affects which buildings are needed first and which will remain in use.

Man camp housing units intended for relocation also need an accessible route out of the site. Later additions, fences and storage areas can otherwise obstruct the lifting and loading space used during the original installation.

prefab mine camp buildings for sale

Accommodation for Longer Stays

Long rotations make laundry, personal storage and recreation rooms a regular part of life. At a site with few places to go after work, shared indoor areas provide space away from the bedroom.

Military Camp Buildings

Military camp buildings serve several distinct functions: barracks, administration, dining, sanitation and training. Separating accommodation from operational areas gives each part of the facility its own access arrangements.

Any specialist protective performance is a separate requirement. The term “modular” describes the construction approach; it does not establish a building’s security rating.

Modular Construction Camp Solutions

The camp opening date is often tied to the arrival of the first workforce. Building production, site preparation and installation form separate parts of that programme; progress in one does not remove a delay in another.

Oil and Gas Camp

Oilfield living quarters accommodate crews working through day and night shifts. Bedrooms are in use while cleaning, catering and transport continue elsewhere in the camp.

Crew changeover adds another pressure: arriving personnel, departing personnel and housekeeping can all require access to the same accommodation block. Reception, luggage storage and circulation areas support that handover.

Karmod’s Libya project shown above combines offices, accommodation, dining and sanitary facilities in a four-building complex. It illustrates the mix of buildings involved in oilfield housing solutions, without making every function part of the sleeping block.

Ventilation for Everyday Camp Use

Modular camps and workforce housing contain spaces with very different moisture loads. Showers, kitchens and clothes-drying areas require particular attention to extract ventilation; cooling a bedroom alone does not address moisture generated elsewhere.

Refugee Accommodation Camps

Emergency accommodation may have to serve families for much longer than first expected. Privacy, accessible facilities and space for children need attention alongside the immediate provision of shelter.

A container refugee camp can use purpose-built containers for living spaces, toilets, showers and support services. The accommodation arrangement should reflect household sizes, with provision for healthcare, education and communal facilities where required by the programme.

Modular Camp Needs

A camp with enough beds can still struggle at breakfast or at the showers. Shared facilities set practical limits on occupancy, especially when most residents follow the same working hours.

  • Toilets and showers: Quantities, privacy, cleaning access and hot water capacity should match the occupancy and usage pattern.
  • Accommodation units: Room layouts need space for beds, personal belongings and access to doors and windows.
  • Modular offices: Administration may require meeting rooms, document storage and communications equipment as well as desks.
  • Modular Cafeterias and Dining Halls: Seating depends on whether everyone eats together or meals are served in sittings. Cooking on site also requires preparation, storage and washing areas.
  • Support spaces: Laundry, maintenance stores, cleaning cupboards and waste collection areas need to be included in the room schedule.

Fire Safety and Building Specification

In Worker Accommodation Camps, kitchens, sleeping blocks and stores present different fire safety considerations. Escape routes, material performance and alarm arrangements belong in the project’s fire safety design, including the spaces between buildings.

Pedestrian Routes and Deliveries

A dining hall entrance and a kitchen delivery point serve different traffic. Layouts for off site camp solutions can separate these routes, keeping supply vehicles away from the main pedestrian approach at meal times.

Modular Camp Design Process

The first layout turns the accommodation brief into building footprints. It shows how much of the available land is occupied by rooms and how much remains for access, shared outdoor areas and services.

Site levels can change the arrangement substantially. A scheme that fits neatly on a flat drawing may require retaining work, altered entrances or a different drainage route on sloping ground.

An extension brings a different constraint: existing services. Spare land beside a camp does not necessarily mean spare electrical, water or drainage capacity.

Remote Workforce Housing Camps

The last section of the delivery route can limit what reaches a remote site. Narrow turns, steep approaches and restricted unloading space affect vehicle access and lifting arrangements even when the main road journey is straightforward.

Camp Buildings Cost

The cost of a camp depends on the floor area, room arrangement, specification and delivery location. Two camps with the same bed capacity can have different prices if one includes private bathrooms, a larger kitchen or more administrative space.

A useful quotation separates building supply from transport, installation, equipment and site works. Foundations, service connections, water storage and external access may require their own budgets unless they are expressly included.

If the camp is intended for a second project later, relocation costs also belong in the assessment. Potential reuse has value, but dismantling, transport, repairs and a new installation will still need to be funded.

Man Camp Projects

The Ufuk Boru worksite complex in Osmaniye brings worker accommodation, a dining hall and administrative facilities together. The worker housing project in Turkey includes dormitories, a kitchen, dining space and sanitary facilities.

Modular Base Camp Infrastructure and Support Units

Base camp infrastructure extends to stores, maintenance areas and covered operational spaces. A wider procurement brief may also include Pneumatic / Modular Tents and Shelter Systems, Hangars / Warehousing Shelters, and Canteen / Dining Modules.

These are distinct equipment and building packages. Their inclusion in a wider camp brief does not mean they are all supplied under the accommodation building contract.

Camp Building Plans

Floor plans show what exterior photographs cannot: bed positions, bathroom arrangements, door openings and the usable space within each room.

Furniture layouts are particularly useful in shared bedrooms. They make it easier to see whether a wardrobe door opens fully, whether residents can pass between beds and how cleaning staff reach the room.

Room layouts and the overall site arrangement describe different parts of the proposal. Both are needed to understand how the completed camp will be used.

Workforce Housing & Man Camps

For a new camp enquiry, send your expected occupancy, project location and opening date. An existing room list or site drawing is useful if available; Karmod can discuss the accommodation and supporting buildings from that starting point.

Modular Camp Buildings Frequently Asked Questions